You are here: Home > Earthquake Research > Crustal Deformation > GPS > Auto Processing > DiabloCanyon > bidd
spacer spacer
spacer spacer

spacer

BIDD
Automatic Processing

Summary Info

Data

Plot (.ps)

Plot (.gmt)

North America fixed

ITRF2005

Regionally filtered

Cleaned/Detrended

DiabloCanyon home

USGS Campaign list

Stationinfo (field logs, photos,etc.)

BIDD
Relative to fixed North America


Segment: 0 No-of-obs-used: 6
Vel(mm/a) Vel-sig(mm/a) RMS(mm) StdDevObsUnitWt Vel-XYZ(mm/a):
N: 34.3 1.4 1.42 0.57 -12.2
E: -30.5 1.6 1.40 0.51 39.5
U: -9.9 4.9 5.09 0.53 22.3
Error bars are plus/minus one standard deviation
Error bars on individual observations = formal-error x scale-factor.
Currently the scale-factors are: N:3.0, E:4.0, U:3.0

Red points are positions determined using final orbits
Blue points are positions determined using preliminary orbits
Vel-stddev = sqrt(WN**2+RW**2)
where WN is a white noise contribution from propagating the error bars on the observations
and RW is a random walk contribution (= a*sqrt(timespan)/timespan where a is 0.001 m/yr**1/2)