|
|
|
C240
ITRF2000

|
| Segment: |
0 |
No-of-obs-used: |
7
|
|
Vel(mm/a) |
Vel-sig(mm/a) |
RMS(mm) |
StdDevObsUnitWt |
Vel-XYZ(mm/a):
|
| N: |
-11.3 |
0.7 |
4.36 |
0.96 |
-19.0
|
| E: |
-16.8 |
0.9 |
2.75 |
0.48 |
-0.1
|
| U: |
2.1 |
2.4 |
17.96 |
1.16 |
-7.4
|
|
Error bars are plus/minus
one standard deviation
Error bars on individual observations
= formal-error x scale-factor.
Currently the scale-factors are:
N:3.0, E:4.0, U:3.0
Red points are positions determined using final orbits
Blue points are positions determined using preliminary orbits
|
Vel-stddev = sqrt(WN**2+RW**2)
where WN is a white noise contribution
from propagating the error bars
on the observations
and RW is a random walk contribution
(= a*sqrt(timespan)/timespan
where a is 0.001 m/yr**1/2)
|
|