You are here: Home > Earthquake Research > Crustal Deformation > GPS > Auto Processing > Tonopah > tono
spacer spacer
spacer spacer

spacer

TONO
Automatic Processing

Summary Info

Data

Plot (.ps)

Plot (.gmt)

North America fixed results

ITRF2000 results

Tonopah home

USGS Campaign list

Stationinfo (field logs, photos,etc.)

TONO
Relative to fixed North America


Segment: 0 No-of-obs-used: 2041
Vel(mm/a) Vel-sig(mm/a) RMS(mm) StdDevObsUnitWt Vel-XYZ(mm/a):
N: 1.8 0.4 2.50 0.78 -2.7
E: -3.3 0.4 4.19 0.82 1.9
U: 0.8 0.4 10.26 0.86 1.9
Error bars are plus/minus one standard deviation
Error bars on individual observations = formal-error x scale-factor.
Currently the scale-factors are: N:3.0, E:4.0, U:3.0

Red points are positions determined using final orbits
Blue points are positions determined using preliminary orbits
Vel-stddev = sqrt(WN**2+RW**2)
where WN is a white noise contribution from propagating the error bars on the observations
and RW is a random walk contribution (= a*sqrt(timespan)/timespan where a is 0.001 m/yr**1/2)