You are here: Home > Earthquake Research > Crustal Deformation > GPS > Auto Processing > WesternBRPBO > moil
spacer spacer
spacer spacer

spacer

MOIL
Automatic Processing

Summary Info

Data

Plot (.ps)

Plot (.gmt)

North America fixed

ITRF2000

Regionally filtered

Cleaned/Detrended

WesternBRPBO home

USGS Campaign list

Stationinfo (field logs, photos,etc.)

MOIL
ITRF2000


Segment: 0 No-of-obs-used: 554
Vel(mm/a) Vel-sig(mm/a) RMS(mm) StdDevObsUnitWt Vel-XYZ(mm/a):
N: -9.4 0.8 2.00 0.68 -18.7
E: -17.7 0.8 2.63 0.73 1.8
U: 0.3 1.2 7.74 0.79 -6.9
Error bars are plus/minus one standard deviation
Error bars on individual observations = formal-error x scale-factor.
Currently the scale-factors are: N:3.0, E:4.0, U:3.0

Red points are positions determined using final orbits
Blue points are positions determined using preliminary orbits
Vel-stddev = sqrt(WN**2+RW**2)
where WN is a white noise contribution from propagating the error bars on the observations
and RW is a random walk contribution (= a*sqrt(timespan)/timespan where a is 0.001 m/yr**1/2)