 |
Proposed Site at Castle Rock State Park, 2001
|
 |
 |
Proposed Site at Yerba Buena Island, 2001
|
 |
 |
Proposed Site at Rancho San Antonio Park, 2001
|
 |
 |
Proposed Site at St. Vincent, 2001
|
 |
 |
 | Proposed Miller/Knox Site at
Point Pablo, 2001
|
 |
 |
Proposed Brickyard Site at
Point Pablo, 2001
|
 |
 |
 |
 |
Drilling at Marin Headlands Site, 2001
|
 |
 |
Installation of Strainmeter at Ox Mountain Site, 2001
|
 |
 |
Building at Brisbane Strainmeter Site, 2002
|
 |
 |
Drilling at Marin Headlands Site, 2001
|
 |
 |
Installation of Strainmeter at Ohlone Site, July 16, 2001
Strainmeter prior to being lowered into hole at Ohlone Site (Hercules, Ca.) at 4:51pm. The instrument was installed at a depth of 672 feet.
|
 |
 |
Test of Strainmeter at Ladera Test Site, June, 2001
Strainmeter is lowered into test hole at Ladera, near the USGS
in Menlo Park, before being taken to the field for installation.
|
 |
 |
Ohlone Installation Site, June, 2001
Site of the first drilling activity for the Mini-PBO near Hercules, California.
|
 |
 |
Drilling Begins at Ohlone Site, June, 2001
Drilling for the first instrument installation begins the week of June 18th near
Hercules, California.
|
 |